What Files Do You Need for a PCBA Quote?

By RONGHE Engineering Team October 7th, 2026 42 views

A PCBA quote needs information about the board, the components to fit, and the work required after assembly. Start with PCB manufacturing files, a bill of materials, a pick-and-place file, and assembly instructions. Include programming and test requirements when they are part of the project.

The files should describe the same design revision. Your inquiry should also state the quantity, project stage, and target delivery schedule. Together, these details define the scope the manufacturer needs to evaluate.

Prepare the board manufacturing files

Gerber data describes the PCB manufacturing layers. Prepare the relevant copper, solder mask, silkscreen, board outline, and drill information, together with the board specifications needed for your project.

State the layer count, board thickness, copper thickness, surface finish, and any other specified manufacturing requirements. Identify any special requirements explicitly rather than expecting the manufacturer to infer them from a board image.

If your design uses ODB++ instead of a Gerber package, confirm the required submission format with your manufacturing partner. These files describe the board; a PCBA inquiry also needs component and assembly information.

Provide a clearly defined BOM

The bill of materials identifies the components to populate. Include these fields:

  • Reference designators
  • Quantity per board
  • Manufacturer and manufacturer part number, or MPN
  • Package or footprint
  • Component description or value where needed to identify the part

Mark components that should not be fitted, and explain the DNP or DNI notation used in your files. Keep the BOM consistent with the PCB revision and assembly instructions.

State whether components are customer-supplied, manufacturer-sourced, or a combination. Identify specified brands and parts that require approval before substitution. A sourcing suggestion should remain subject to review and approval rather than becoming an automatic change to the design.

Include the pick-and-place file

The pick-and-place file, also called a component placement list or CPL, describes where components are placed. It should identify the reference designator, X and Y coordinates, rotation, and board side for each relevant placement.

Clearly identify the coordinate units and origin. Check that the reference designators and populated components agree with the BOM, including top and bottom placement data when the design uses both sides.

Placement data supports assembly preparation. Assembly drawings should clarify polarity, orientation, and other details that need explicit instructions.

Explain assembly, programming, and testing

Include an assembly drawing or instructions for requirements that are not clear from the other files. Depending on the project, these may cover component orientation, connectors, through-hole assembly, mechanical assembly, or areas that need special treatment.

If firmware programming is required, identify the firmware version, provide the programming files and method, and explain how successful programming should be verified. State whether configuration parameters or serial numbers are needed.

Define the required functional tests and acceptance criteria. If you have a test procedure or fixture, identify its version and availability. Explain whether the project calls for full inspection or sampling, and specify any agreed aging or coating requirements.

For a design change or engineering-support request, explain what should change and provide the relevant schematic or design requirements. This scope differs from manufacturing an existing, defined design.

Add quantity and project information

Alongside the engineering files, include:

  • The product application and project stage
  • Prototype, pilot-run, or production quantities
  • Any expected repeat-order volume
  • The target delivery schedule
  • Component supply and substitution requirements
  • Programming, testing, coating, packaging, or final-assembly requirements that affect the requested scope

Describe the target schedule as a requirement for evaluation. Component availability, file completeness, and the agreed manufacturing and test scope still need review before delivery commitments are made.

Check the package before sending it

Confirm that the manufacturing files, BOM, placement data, and drawings belong to the same revision. Check for missing data, conflicting reference designators, unclear orientation, and incomplete assembly or test instructions.

If the design is still changing, explain its status and identify which requirements are provisional. List any missing files rather than leaving the manufacturer to assume they are unnecessary.

Common questions

Can I request a PCBA quote with Gerber files alone?

Gerber files can support a review of the PCB manufacturing scope. A complete assembly evaluation also needs information about the components, their placement, and the required assembly and test work. If some files are unavailable, explain what is missing and ask what can be assessed at that stage.

Does a BOM replace the placement file?

The BOM defines the components. The placement file defines their positions, rotations, and board sides. They serve different purposes and should agree with the same design revision.

Do I need a schematic for every inquiry?

The required files depend on the scope. An inquiry for manufacturing an existing design usually starts with the manufacturing, BOM, placement, and assembly data. A design modification or a technical issue may require the schematic and additional engineering information. Confirm what is needed for your project.

Request a project review from RONGHE

Have a PCBA project ready for evaluation? Send your available files and describe the quantity, revision, target schedule, and required assembly or test work. If some documents are still being prepared, identify what is missing.

Contact RONGHE about your PCBA project.

F405 vs F722 vs H743 Flight Controllers: How to Choose the Right MCU for Your UAV,www.rohepcba.com
Previous
F405 vs F722 vs H743 Flight Controllers: How to Choose the Right MCU for Your UAV
Read More
AOI vs. FCT: What Each PCBA Test Can Verify,www.rohepcba.com
Next
AOI vs. FCT: What Each PCBA Test Can Verify
Read More